CASE STUDY

Efficiency Equals Profits

Profits are often determined by how quickly and efficiently you respond to changes in market conditions. When you decide to seize a sizable opportunity in wood treatment, you want to be up and running sooner rather than later.

Until now, adding a wood treatment plant was a process that took months. Equipment would be shipped in, followed by additional parts and fittings. Various installation crews would set up and connect the many parts. Before everything was assembled, tested and ready, it wouldn’t be unusual for a couple of months to have passed.

 

To learn about pressure testing 101 please check out this article from SFPA, please click this link below.

 https://sfpa.org/pressure-treated-wood-preservatives-101/

 

Days Rather Than Months

We have replaced the traditional piecemeal method of treatment plant setup with a much shorter and faster one that we call “Factory-In-A-Box.”

In short, we ship pre-assembled and pre-tested components to your doorstep – all in a box with the necessary fittings and parts. Although they are, of course, not literally in the box, our engineers then show up to perform the final assembly, installation and tests. And a couple of days later, they will hand you the keys to your new treatment plant, which will be all ready to roll.

Your Undivided Focus

Even under the best of circumstances, a lengthy setup and implementation process can have negative effects on your business focus. Although your management team might not be directly involved, the work can still affect your daily routines for months.

With American Wood Technology, your factory in a box will be ready to go in just a matter of days. Our specialists will be there to help every step of the way, leaving your team to operate with an undivided focus on your business.

Give us a call at 1-877-785-0274 or send us a message so that we can discuss what should go into your “Factory-In-A-Box.”